    Upcoming Crawford Notch Road Work

    J&J

  2. #2
    Senior Member B the Hiker's Avatar
    Join Date
    Jan 2008
    Location
    Plainville, CT
    Posts
    753
    Moat Mtn Smokehouse's Facebook page just posted this update:

    The official plan from NH Department of Transportation:
    Conway – The project involves pavement preservation on US 302/NH 16, from approximately 340 ft. south of the NH 16/US 302 intersection, northerly 4.6 miles, to a pavement joint just south of the Bartlett/Conway Town Line. Pavement work includes a full width 1.5" High Strength inlay from the south limit to approx. 400 ft. north of the Mountain Valley Blvd intersection (1,675 LF), and micro milling, crack sealing and a 3/4" bonded wearing course inlay, full width, for the remaining length (4.3 miles). Incidental work includes repair and/or resetting of drainage structures. Lane and shoulder closures will be required. Due to anticipated traffic volumes, majority of work will be done at night. Isolated daytime lane and shoulder closures may be allowed for some work operations such as repair of drainage structures, milling and crack sealing. Roadway will be returned to normal operation during non-work hours. In the area of the proposed bonded wearing course, traffic will be maintained on a "micro-milled" surface for approximately 1 month to allow for crack sealing and a 14 day cure time for the crack sealant.
    Completion: June 2018 Estimated cost: $1,891,838.00