Results 1 to 3 of 3

Thread: Trailwrights work day on Dan Doan Trail July 14, 2012

  1. #1
    Senior Member TrailwrightBratt's Avatar
    Join Date
    Aug 2009
    Location
    Sanbornton,N.H.
    Posts
    321

    Trailwrights work day on Dan Doan Trail July 14, 2012

    Seven hearty workers hit the trail to make some needed improvements.
    We decided to start at the farthest project for the day and work back.
    The first project was to decide what to do with this section of Boggy wet quagmire and corduroy.
    Click image for larger version. 

Name:	Dan Doan july 14th. 2012 006.jpg 
Views:	121 
Size:	111.3 KB 
ID:	3946
    We decided to move the treadway to higher and drier ground due to no drainage possibilities. It involved laying it out with flagging by Jason staying high and coming back to the road some 700 feet later. Problem one solved,as Gene finished up near the end of the improvement.
    Click image for larger version. 

Name:	Dan Doan july 14th. 2012 005.jpg 
Views:	119 
Size:	109.7 KB 
ID:	3947

    Next on the list was a section of trail still in the old skid road near a rock Culvert that had washed out due to lack of maintenance. The footing was loose rock and hard on the ankles. We filled one side in with small rock and covered the 25 lin. feet with gravel. Ditched the other side to get the water to enter the culvert.
    Click image for larger version. 

Name:	Dan Doan july 14th. 2012 009.jpg 
Views:	135 
Size:	112.4 KB 
ID:	3948
    Removed a 250 lb. rock with bars that was partially blocking the Culvert outlet. That took care of project #2.
    Side hilling to get the treadway out of another washed out area was on Jasons mind Sooo we tackled that next and Bill was caught working and jason supervising.
    Click image for larger version. 

Name:	Dan Doan july 14th. 2012 008.jpg 
Views:	111 
Size:	111.6 KB 
ID:	3949
    Next was relocating the treadway again in a wet area moving the treadway side to side Installed 5 step stones to cross over and a few pavers and cleaning the ditch. More ditching is needed in the future .
    Click image for larger version. 

Name:	Dan Doan july 14th. 2012 016.jpg 
Views:	105 
Size:	111.2 KB 
ID:	3950


    Time and the heat started taking it's toll and we were happy with what we accomplished for the day.
    Bugs were not a problem except for Gene so all in all a fun day. Next time you hike this trail check out the work.
    Now for the future. Many projects need doing and lot's of rock work to be installed higher up above the Mousely Brook crossing including and one more really wet area above the Mousely Brook crossing that needs step stones or a turnpike.
    Hopefully we can get some more help for the September 15th. work day.
    Totals for the day 7 people x 7 = 49 hours. AND all tools accounted for.
    My thanks for all the fun to the entire crew.

  2. #2
    Senior Member Jason Berard's Avatar
    Join Date
    Oct 2006
    Location
    N. Thetford, VT Avatar: Cabot, winter 2011
    Posts
    1,321
    What a great day out there! and so much accomplished!
    Many thanks to Trailwrights for the assistance on this trail.
    Real progress has been made in the last several years, and more to come!
    Check it out, and join us for a work day. Mark September 15th on your calendars!

    By the way, Hal, do I have Peggy to thank for catching me "supervising"?

  3. #3
    Senior Member TrailwrightBratt's Avatar
    Join Date
    Aug 2009
    Location
    Sanbornton,N.H.
    Posts
    321
    Jason YUP it is all her fault. I was busy working

Similar Threads

  1. Replies: 1
    Last Post: 08-09-2015, 10:24 PM
  2. Replies: 0
    Last Post: 07-21-2014, 08:01 AM
  3. Report for Dan Doan Trail Sept.15,2012 with Trailwrights
    By TrailwrightBratt in forum Trip Reports
    Replies: 1
    Last Post: 11-08-2012, 12:05 PM
  4. Dan Doan trail with Trailwrights sat. July 14,2012
    By TrailwrightBratt in forum Trips & Events
    Replies: 6
    Last Post: 07-14-2012, 02:22 PM
  5. Dan Doan Trail minyenace with Trailwrights
    By TrailwrightBratt in forum Trips & Events
    Replies: 0
    Last Post: 05-07-2010, 08:32 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •