Thread: N.E. Clean Power Connect in Maine - Should we care ?

  1. #121
    Senior Member
    Join Date
    Jul 2015
    Location
    Lewiston, and Biddeford Maine
    Posts
    803
    Quote Originally Posted by TCD View Post
    I wonder if, in China, they shut down energy projects for a bat.
    nope, they sell them in the market for food

  2. #122
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    Its still churning on

    https://bangordailynews.com/2021/07/...ate-questions/

    https://bangordailynews.com/2020/10/...ridor-project/

    Note, you may have to open up a private browser to read them

  3. #123
    Senior Member Vermonster's Avatar
    Join Date
    Sep 2003
    Posts
    146
    This story has more plot twists than a good crime novel.

    Maine-Quebec power corridor in jeopardy after judge vacates public land lease
    The decision may imperil the planned New England Clean Energy Connect corridor, intended to bring hydroelectric power from Quebec to Lewiston.

    A state judge has vacated a lease of public land to Central Maine Power parent company Avangrid for part of its planned 145-mile electric corridor through western Maine, likely putting the entire project in peril.

    Superior Court Justice Michaela Murphy said in her ruling Tuesday that state public land officials failed to make a required finding that the lease would result in no reduction or substantial alteration to the public lands being leased and, therefore, the agreement was not valid. https://www.pressherald.com/2021/08/...ic-land-lease/

  4. #124
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    The history for this could arguably go back to Governors Baxter's fairly convoluted method used to transfer BSP to the state by forcing multiple legislative sessions to reaffirm that the land was accepted with perpetual restrictions. He was a politician and realized that politicians could not be trusted to do the right thing. Maine and NH both have a sad history of taking large blocks of public land and selling it at low cost to well connected private businesses. Maine sold off almost all its public lands at one point and if not for a quirk in the township rules and a long lawsuit much of the state owned land would still be private. This came back to head where there was public demand to preserve Bigelow Mountain from a planned ski resort but well connected developers working with state officials ignored voter sentiment. The result was a citizens referendum that forced the state to create the Bigelow reserve and fund the purchase of the lands. After the Bigelow project, Land for Maine's future funding rounds have had high voter support. Just as importantly they forced the legislature to create the Bureau of Public lands that attempted to isolate the lands from short term political manipulation. This was most recently tested in court during the LePage administration where the Governor tried to force the BPL to substantially exceed sustainable harvest levels on public lands to increase short term revenue. Le Page also refused to spend voter approved funding for public land during his administration.

    The current governor's support for CPC has been suspicious. She is from Western Maine (Farmington area) which has been in a long term economic slump due to the collapse of the wood products industry. That area is going to be major benefactor of the short term economic boost from the construction. Central Maine Power has been a long term political supporter in Maine and quite generous with political support. Many of the claimed environmental benefits of the project would not hold up under proper carbon accounting (its effectively rebranding fossil power as "clean hydro") and my guess is the governor would rather get some minimal long term benefits and some big short term benefits before the entire project goes down the drain.

    If its up to the legislature, there has already been one citizens referendum to shut down the project (blocked by the state supreme court)and another block of three linked ballot initiatives scheduled for this November. Its likely this initiative will pass effectively shutting the project down and no doubt the results will be in court for a few years.
    Last edited by peakbagger; 08-11-2021 at 06:43 AM.

  5. #125
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920

  6. #126
    Senior Member maineguy's Avatar
    Join Date
    Sep 2003
    Location
    Maine
    Posts
    572
    And people wonder why these projects are so expensive and take so long...

  7. #127
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    There is an already permitted project in VT with support from the population with far more return to the state in the long term. It has been in place for several years ready to go in VT. HQ shopped the project to get power to Mass around to whatever entity would build it the cheapest. The VT project under Lake Champlain and along existing roads and right of ways was not the cheapest. Eversource initially won out with NP by claiming to do it for a lower cost and we all know the result of cutting corners. CMP did a postmortem of NP and tried to come up with another cheap project. Unlike NP, they thought they had locked in the right of way(apparently someone assumed they could pull off the lease on the state owned land), they got Conservation Law Foundation (a predominantly Mass funded Non Profit) tp support (CLF opposed NP) and they bought off several prominent environmental leaders in the state to support the project (or at least not oppose it) which delayed the organization of the opposition.

    Large projects like this can be done quickly, PNGTS did it 20 years ago through Northern NH and SW Maine. It can be done but trying to cut corners and using political influence to take shortcuts can lead to delays and over runs like this. The VT line would have been up and running by now although it would still be power from a very questionable source.
    Last edited by peakbagger; 08-14-2021 at 12:38 PM.

  8. #128
    Senior Member maineguy's Avatar
    Join Date
    Sep 2003
    Location
    Maine
    Posts
    572
    Name this project: A highway (road) almost 1400 miles long thru pristine wilderness completed in 6 months. The paperwork for this project alone would probably take 10 times as long, and...the project would probably never be green lighted.

  9. #129
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    Assuming you are referring to the Al Can highway, I think it took 8 Months . Pretty simple when a war allows complete disregard for environmental degradation. Plus no problem with landowners and pesky natives and basically infinite resources thrown at it. Arguably the road took far longer to build as it has been under reconstruction since it was originally built.

    Currently the Chinese and Brazilian governments are funding far more epic road building projects for resource exploitation.

  10. #130
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    So the latest comes down to a one mile stretch over state land. https://bangordailynews.com/2021/10/...dor-approvals/ The subject of direction drilling under the Kennebec river gorge came up early in the project. CPC had stated that it was impossible to drill under the gorge but when it was obvious that running overhead lines over the gorge might torpedo the project they switched to underground drilling under the gorge which I think reduced the capacity of the line. Now drilling is coming up again to deal with this inconvenient strip fo Maine Public Reserve land.
    Despite being over the state line I do get a lot of the targeted ads for the project when streaming regional Maine news. There must be 10 to 20 variations of the vote no ads, each one obviously crafted to misinform a different portion of the voters. There are probably 3 variations of the vote yes ads admittedly with some bias towards different voters.

  11. #131
    Senior Member
    Join Date
    Aug 2013
    Location
    MWV NH
    Posts
    374
    Itís amazing to me that anyone would listen to a political ad. They are always over the top misleading. You have to do your own homework and make an informed decision, which unfortunately few people do (in defense, because itís time consuming). Itís a shame there isnít much in the way of a decent media outlet that would fairly present both sides of the issue and present a simple balance sheet that you could look at and decide what matters most to you.

  12. #132
    Senior Member
    Join Date
    Sep 2003
    Location
    Gorham NH
    Posts
    6,920
    Its the Big Lie Concept, repeat a falsehood multiple times and its enough to sway the undecided. Its a complex issue as are many future decisions required to decarbonize the grid. IMHO its too complex for a typical voter to understand and ultimately they will fall back on trusting people who claim to understand the issues when they cast their vote. It a perfect place for marketing to sway votes and recent news is this is the most expensive referendum campaign ever held in Maine. Many hot buttons are being pushed with the campaigns.

    BTW there is another large power line proposed to connect Northern Maine to the ISO New England grid which is in the background. There are several major proposed wind farms that are currently on the Northern Maine grid (actually the New Brunswick grid) that are stalled until that line is installed to give them access to the ISO New England grid.

  13. #133
    Senior Member maineguy's Avatar
    Join Date
    Sep 2003
    Location
    Maine
    Posts
    572
    Quote Originally Posted by peakbagger View Post
    Its the Big Lie Concept, repeat a falsehood multiple times
    If you like your power line, you can keep your powerline...

  14. #134
    Senior Member
    Join Date
    Aug 2013
    Location
    MWV NH
    Posts
    374
    Quote Originally Posted by maineguy View Post
    If you like your power line, you can keep your powerline...
    Ha ha ha!!

  15. #135
    Senior Member
    Join Date
    Aug 2013
    Location
    MWV NH
    Posts
    374
    Quote Originally Posted by peakbagger View Post
    Its the Big Lie Concept, repeat a falsehood multiple times and its enough to sway the undecided. Its a complex issue as are many future decisions required to decarbonize the grid. IMHO its too complex for a typical voter to understand and ultimately they will fall back on trusting people who claim to understand the issues when they cast their vote. It a perfect place for marketing to sway votes and recent news is this is the most expensive referendum campaign ever held in Maine. Many hot buttons are being pushed with the campaigns.

    BTW there is another large power line proposed to connect Northern Maine to the ISO New England grid which is in the background. There are several major proposed wind farms that are currently on the Northern Maine grid (actually the New Brunswick grid) that are stalled until that line is installed to give them access to the ISO New England grid.
    And sadly most people think only one side does it.

Similar Threads

  1. Maine power lines controversy- from "The Trek"
    By Scubahhh in forum Q&A - New England
    Replies: 1
    Last Post: 12-20-2019, 05:17 PM
  2. Replies: 1
    Last Post: 11-02-2018, 02:33 PM
  3. Garmin Connect/ Wireless Upload Problem
    By Remix in forum General Backcountry
    Replies: 7
    Last Post: 01-26-2015, 10:27 AM
  4. Place to get clean
    By jtremont in forum Q&A - New England
    Replies: 15
    Last Post: 07-28-2008, 08:56 AM
  5. Replies: 6
    Last Post: 08-08-2006, 12:36 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •