
Originally Posted by
peakbagger
It comes down to grammar which I dont pretend to be an expert The "this" referred to CPC not the oil refinery.
As for what and how the 1974 project was voted down I was in high school. I did on the other hand have to get to know the SEC commission process as I had to sit before on on a proposed project in Berlin. As part of the prep we have a former PUC commissioner assisting us and he was the that gave us the history on the SEC. I didnt represent that the SEC process stopped the 1974 refinery I represented that SEC was set up for Megaprojects. I guess I skipped that the NH SEC regs were put in place after the 1974 project.
I guess we can agree on one thing, Mass should be generating their own "carbon neutral" power, be it nuclear or other.